Skip to content
 

Construction Day 7: Electrical and Flooring



Day 7 – Electrical wiring has been run into new box

As seen here in the bedroom, plywood is layed out across the entire house to
level the flooring.

What you notice is that there used to be a hallway with a door on the side
of the house. After some investigation it turns out the hosue next door’s "front
entrance" into the lower floor is also on the side. Apparently someone
converted the garage into the living area and closed down this hallway.


Leave a Reply

You must be logged in to post a comment.